![]() |
Allen Computing and Business Analysis |
This service is available for converting data from a variety of sources (plain text, word processing programmes, .pdf files, web pages etc.) into Excel. The presentation is adjusted to suit the needs of the user.
Aimed at Internal Audit units and other consultancy organisations who require high speed conversion of their current audit/work programmes from the standard text based packages into MS Excel worksheets (or templates).
For most simple audit/work programmes you can estimate cost
ACBA Requirements
The Ordering Process
This covers the design and development of a range of Excel-based tailored packages. The range extends from individual working papers to complete functional systems (such as the ACBA Project Resource Scheduling and Control Kit, Auditing Su Doku Puzzles or Post a String). Most, but not all, systems development is undertaken within our ACBA Electronic Working Papers package (EWP). The use of EWP has a significant impact on spreadsheet designs and methodologies.
For these developments, the 'Feasibility Study' and the 'Systems Build' always take place in two or more phases which are evaluated and invoiced separately.
The charge for a 'Feasibility Study' will normally fall within the range £30.00 to £70.00 (plus VAT). 'Systems build' charges are much more variable but are dependent on your approval of the approach and charges submitted as part of the 'Feasibility Study'.
ACBA Requirements - Feasibility Study
The detail required for a 'Feasibility Study' is considerable. However this can be sent using the ACBA Spreadsheet Design Facility. Once completed you will be sent an email quoting for the cost a 'Feasibility Study' based on the spreadsheet specification provided.
Results of the Feasibility Study
The results will recommend a breakdown of the project into module building blocks (if needed) showing, where appropriate, the inter-dependency between modules.
For each recommended build module the results will include
The user must approve each module separately before construction can start.